Modelling guide

Material used by length, area or weight

A product uses material by measure rather than by piece: metres of cable, square metres of sheet, kilograms of powder.

Pattern Existing features combined; the result is exact.

How

  • Make the material a raw material product (isRawMaterial: true) and let the operation consume a formula quantity: "qty": "P.harness_length". The stock is then counted in that measure (fractions allowed).
  • Time the work per measure with a resolver: "m": "P.harness_length" and "unit": "m" on the capability.
  • A conversion (metres to kilograms) is a formula you write: "qty": "P.harness_length * 0.12" for 0.12 kg per metre.

Check

Harnesses are 3-9 m. Cutting takes 6 s per metre (36 s on average) and uses that many metres of cable; crimping takes 45 s. At a 120 s takt one cutter and one press make the shift's 240 harnesses.